Reef Drive Development

Nxco Mining Technologies & Maverick Blasting Consultants

 

Sequential timing using the Maxclip 5 way clips.

4000ms Down-the-hole, 200ms surface delay.

Burden and Spacing of 500mm

No shockwave or air-blast

PPV of 1,88mm/s measured at 15m

fly rock less than 10m

muck pile on the face

fragmentation of 250-300mm.

Using Nxburst (Nonex) there is no back break or over break, leaving the hanging wall, foot wall and side walls competent (no fractures) for a safer mine.

Congratulations on great work!